We shall furnish all labor, implements, machinery, equipment, tools, apparatus, materials, means of transportation, and perform all of the work pertaining to Connecting the Sewer from the home to the lateral at the street.
This work includes:
Obtain letter from Health Department and procure permit from Islamorada Building Department
Trenching, placing sewer pipe, and refilling trench for sewer lateral
Pump out tank and backfill it with soil
Call us at (305) 304-4501 or email us at djengel@bellsouth.net for more information on how we can help you get connected.
Eventually, every one will have to be connected to the FKAA wastewater system. Installation is underway now for the wastewater and reclaim distribution system throughout the Keys. We are prepared to take care of everything you need to comply and connect to the new wastewater system.
Once you are notified that it is available in your area, you will be required to start your connection within a specified time frame. When that time comes, you can count on us to assist you for an easy connection. Call us for rates and information at (305) 304-4501 or at djengel@bellsouth.net.
For current information from the Florida Keys Aqueduct Authority, you can contact Julie Cheon at (305) 295-2178 or at jcheon@fkaa.com